Back to Elutration System

Company
Contact
Address
Phone
Fax
e-mail

Material to be cleaned/separated - be very descriptive:

Will both the light and heavy fractions be recycled?
Yes No

Throughput rate in pounds/hour

Total conveying distance, if other than side-by-side installation (shown below) is required:

Side-by-side Yes No
Vertical feet
Horizontal feet
# of elbows

Material Source (granulator, pelletizer, etc) - be specific on sizing/model of source:

Special Requirements that differ from standard Elutriation System (shown below):